No Copy


No Right Click

Selamat Datang di Situs Belajar PLC dan SCADA

Blog gratis yang menyajikan berita seputar PLC dan SCADA.

Microsoft Windows 10

Berita seputar Microsoft Windows 10. Membahas berbagai informasi mengenai Microsoft windows terbaru.

Apple OSX

Artikel yang membahas tentang OSX terbaru dari Apple tentu sangat menarik untuk dibaca. Tak kalah serunya jika kita paham mengenai tips dan trik yang ada didalamnya.

Photography

Photography asik dan menarik jika kita mengetahuinya lebih dalam. Disini kita bisa melihat berbagai hal dari sudut pandang photo. Menarik untuk dipahami.

Thursday, March 25, 2010

Configuring EtherMeter™–CompactLogix Communications Using EtherNet/IP

Logo of the Allen-Bradley brand, used after Al...Image via Wikipedia
 The purpose of this document is to provide assistance to the Allen Bradley CompactLogix PLC user who wishesto connect to an EtherMeter using theEtherNet/IP™protocol. This document assumes that the user is well‐versed in CompactLogix PLC’s and the RsLogix 5000 Programming Environment.
When creatinganEtherNet/IP™ client/server connection between an Allen Bradley CompactLogixPLC(client)and an EtherMeter™ (server), no specialsetup is generally required withintheEtherMeter’s Setup Menu. The EtherMeterfeatures an“always‐on” EtherNet/IP™server on TCP logical port44818; and itisconfigured to auto‐detect and service incoming client requests from CompactLogix PLC’s. To simplify integration into an EtherNet/IP network, the EtherMeter emulates aSLC/500 series PLC.
In thissample application, the CompactLogixPLC’s usedincluded aModel 1769‐L32E with integratedEthernetand aModel 1768‐L43 withan attached 1768‐ENBT/A EtherNet/IPBridge Module.  BothCompactLogix processors were flashed with firmware version 17.2.5. The programming softwarewasRsLogix5000 Version 17.
The 1769‐L32E processor wasprovided courtesy ofMissouri American WaterCompany; and the 1768‐L43 processor and RsLogix5000 programmingsoftware were provided courtesy ofFrench GerlemanCorp.(St.Louis, MO).

1. Wiring Configuration.
Inthis example, theEthernet ports of theCompactLogix and EtherMeter are wired directly to each other, without anEthernet switch, using a singleEthernetcrossover cable. Alternatively, theEthernet ports ofboththeCompactLogix and EtherMeter could beconnected to a common Ethernet switch ifexpanded networkconnectivity is desired. For reference, the wiringandhardwareconfiguration is illustrated in Figure 1. 
Thealternateconfiguration was createdwitha CompactLogixModel 1768‐L43 plus a1768‐ENBT/A EtherNet/IP bridgemodule. SeeFigure 2. However, the setup and programming procedures were identical. For the sake of brevity, this Application Note documents connection tothe 1769‐L32E. 

For complete information Please Click Here! for download.
Reblog this post [with Zemanta]

Programming Manual - Logix5000 Controllers Ladder Diagram

Ladder diagram.Image via Wikipedia
This manual shows how to program Logix5000 controllers with the relay
ladder programming language. This manual is one of a set of related manuals
that show common procedures for programming and operating Logix5000
controllers. For a complete list of common procedures manuals, see the Logix
5000 Controllers Common Procedures Programming Manual, publication
1756-PM001.

The term Logix5000 controller refers to any controller that is based on the
Logix5000 operating system, such as:
• CompactLogix controllers
• ControlLogix controllers
• DriveLogix controllers
• FlexLogix controllers
• SoftLogix5800 controllers

For download please click here!
Reblog this post [with Zemanta]

Tuesday, March 23, 2010

How to use MULTIMETER (Basic Knowledge for Electrician or Automation)

Below is videos talking about how to use Multimeter. It's very important even if only basic but always use this tools during we do commissioning or test the circuit. How to use it? Please watch videos below.




PLC Application Samples (Videos)

Please see on videos just make us more understanding about PLC.





Siemens Premium Studio 2009

Siemens AGImage via Wikipedia
Premium Studio 2009 provides you with the most important software packages for engineering and runtime for SIMATIC S7/C7, SIMATIC HMI, SIMATIC NET, SINUMERIK und SIMOTION on four data carriers (DVDs). The user can select general settings (e.g. languages for installation, installation path, etc.) and the software packages he requires via a setup specially created for Premium Studio. The installation is then performed automatically (silent), i.e. no further user activities are required. Premium Studio thus provides a significant time and money saving with the installation and maintenance of the software packages. No licenses are included with Premium Studio. For productive operation of the installed software products the user can either use his existing licenses of the versions in question or he must purchase new licenses. Premium Studio 2009 is now available for delivery. 


Product information
Premium Studio will significantly reduce the time and expenses for installation and maintenance of the Siemens Industrial Automation and Siemens Drives Technology software products. This will improve productivity and reduce the overall costs (Total cost of ownership). The benefit to the user increases all the more, the more software products from Siemens Industrial Automation and Siemens Drives Technology are being used.

Fully automatic installation by the Premium Studio Setup
  • One-time selection of the settings required for all software packages, e.g. installation path
  • No further user activities are needed during installation
  • Automatic updating of the existing PG/PC/PCU.50 installations by the products contained on the Premium Studio DVD 
Installation of the selected software in the correct sequence
  • The Premium Studio Setup ensures that any required installation sequences are adhered to.
Reduction of administration and handling (Zero Admin) 
  • Once the software products to be installed have been selected, the installation is performed without any further activities by the user.
  • The selection of the software products to be installed can be recorded by means of a RECORD function. This enables you to perform identical installations on any number of further computers, with a minimum of effort. 
  • The installation can be made from a central computer via the network in this case. The Premium Studio DVDs must either be copied to this central computer or kept in its DVD drive. Installation is then be performed over the network.
Compatibility and interoperability
An extended testing scenario ensures compatibility and interoperability of the product versions contained in Premium Studio. 
Licensing 

By purchasing Premium Studio, the user does not obtain the licenses for the included software products. Before productive use, the required licenses must be purchased through the usual sales channels. However, trial licenses are included for many of the products on the DVDs, with which the software can be tested for a limited period. 
Scope of delivery

The scope of delivery of Premium Studio includes four DVDs (double-layer). These DVDs comprise the individual products listed below. Licenses must be purchased separately as standard products.
Only the versions with their standard licences are listed (Floating or Single License). The upgrade versions of the listed software products can be found on the Siemens Internet Pages or the A&D Mall:
 
Product
Version
Order No.
SIMATIC STEP 7 (Floating License)
V5.4 SP4
6ES7810-4CC08-0YA5
     
Engineering Tools
   
SIMATIC S7-PDIAG (Single License)
V5.3 SP3
6ES7840-0CC04-0YA5
SIMATIC S7-HIGRAPH (Single License)
V5.3 SP1
6ES7811-3CC05-0YA5
SIMATIC S7-SCL (Floating License)
V5.3 SP5
6ES7811-1CC05-0YA5
SIMATIC S7-PLCSIM (Floating License)
V5.4 SP2
6ES7841-0CC05-0YA5
SIMATIC S7-GRAPH (Floating License)
V5.3 SP6
6ES7811-0CC06-0YA5
SIMATIC S7 Distributed Safety (Single License)
V5.4 SP4
6ES7833-1FC02-0YA5
SIMATIC S7 F Configuration Pack V5.5 SP5  
SIMATIC D7 SYS
V7.1
6ES7852-0CC02-0YA5
SIMATIC CFC
V7.1
6ES7658-1EX17-2YA5
SIMATIC Version Trail
V7.1
6ES7658-1FX17-2YA5
SIMATIC Version Cross Manager
V7.1
6ES7658-1CX17-2YA5
SIMATIC Logon
V1.4 SP1
6ES7 658-7BX41-2YA0
SIMATIC PDM
V6.0 SP5
6ES7658-3KX06-0YA5
SIMATIC Modular PID Control FB V5.1 6ES7860-1AA10-0YX0
SIMATIC Modular PID Control Tool V5.1 6ES7830-1AA10-0YX0
SIMATIC Standard PID Control FB  V5.2 6ES7860-2AA21-0YX0
SIMATIC Standard PID Control Tool V5.2 6ES7860-2AA21-0YX0
SIMATIC PID Self Tuner V5.1 6ES7860-4AA01-0YX0
SIMATIC Teleservice Software V6.1 SP2 6ES7842-0CE000YE0
     
Controller    
SIMATIC WinAC RTX 2008 SP1 6ES7 671-0RC06-0YA0
     
Maintenance Station    
SIMATIC Maintenance Station 2009 6ES7840-0WD01-0YA0
SIMATIC Maintenance Station Powerpack 100   6ES7840-0WD11-0YD0
SIMATIC Maintenance Station Powerpack 500   6ES7840-0WD21-0YD0
SIMATIC Maintenance Station Powerpack 1000   6ES7840-0WD31-0YD0
     
Drives
   
Drive ES Basic
V5.4 SP3
6SW1700-5JA00-4AA0
S7-Technology (T-Config)
V4.1 SP1
6ES7864-1CC41-0YX0
SIMOTION Scout
V4.1 SP2
6AU1810-0BA41-0XA0
     
Component-Based Automation
   
SIMATIC iMap
V3.0 SP1
6ES7820-0CC04-0YA5
     
SIMATIC NET Communication Software
   
SIMATIC NET PC products
2008
---
Ind. Ethernet
SOFTNET-S7 Lean 2008
+ Advanced PC Configuration
 
6GK1704-1LW71-3AA0
Ind. Ethernet
SOFTNET-S7 2008
+ Advanced PC Configuration
 
6GK1704-1CW71-3AA0
Ind. Ethernet
SOFTNET-PG 2008
+ Advanced PC Configuration
 
6GK1704-1PW71-3AA0
PROFIBUS
SOFTNET-S7 2008
+ Advanced PC Configuration
 
6GK1704-5CW71-3AA0
PROFIBUS
SOFTNET-DP 2008
+ Advanced PC Configuration
 
6GK1704-5DW71-3AA0
Ind. Ethernet
SNMP OPC Server Basic 2008
+ Advanced PC Configuration
 
6GK1706-1NW71-3AA0
Ind. Ethernet
SNMP OPC Server Extended 2008
+ Advanced PC Configuration
 
6GK1706-1NX71-3AA0
PROFIBUS
S7-5613 2008
+ Advanced PC Configuration
 
6GK1713-5CB71-3AA0
PROFIBUS
DP-5613 2008
+ Advanced PC Configuration
 
6GK1713-5DB71-3AA0
PROFIBUS
FMS-5613 2008
+ Advanced PC Configuration
 
6GK1713-5FB71-3AA0
Ind. Ethernet
S7-REDCONNECT 2008
+ Advanced PC Configuration
 
6GK1716-0HB71-3AA0
Ind. Ethernet
Upgrade S7-REDCONNECT 2008 Powerpack
+ Advanced PC Configuration
 
6GK1716-0HB71-3AC0
Ind. Ethernet
S7-1613 2008
+ Advanced PC Configuration
 
6GK1716-1CB71-3AA0
Ind. Ethernet
TF-1613 2008
+ Advanced PC Configuration
 
6GK1716-1TB71-3AA0
     
SIMATIC HMI Software
   
SIMATIC WinCC
V7.0 SP1
 
128 PowerTags (RT 128) incl. 512 archive variables
 
6AV6381-2BC07-0AX0
512 PowerTags (RT 512) incl. 512 archive variables
 
6AV6381-2BD07-0AX0
2048 PowerTags (RT 2048) incl. 512 archive variables
 
6AV6381-2BE07-0AX0
8192 PowerTags (RT 8192) incl. 512 archive variables
 
6AV6381-2BH07-0AX0
65536 PowerTags (RT 65536) incl. 512 archive variables
 
6AV6381-2BF07-0AX0
102400 PowerTags (RT 102400) incl. 512 archive variables
 
6AV6381-2BJ07-0AX0
153600 PowerTags (RT 153600) incl. 512 archive variables
 
6AV6381-2BK07-0AX0
262144 PowerTags (RT 262144) incl. 512 archive variables
 
6AV6381-2BL07-0AX0
128 PowerTags (RC 128) incl. 512 archive variables
 
6AV6381-2BM07-0AX0
512 PowerTags (RC 512) incl. 512 archive variablesn
 
6AV6381-2BN07-0AX0
2048 PowerTags (RC 2048) incl. 512 archive variables
 
6AV6381-2BP07-0AX0
8192 PowerTags (RT 8192) incl. 512 archive variables
 
6AV6381-2BS07-0AX0
65536 PowerTags (RC 65536) incl. 512 archive variables
 
6AV6381-2BQ07-0AX0
102400 PowerTags (RC 102400) incl. 512 archive variables
 
6AV6381-2BT07-0AX0
153600 PowerTags (RC 153600) incl. 512 archive variables
 
6AV6381-2BU07-0AX0
262144 PowerTags (RC 262144) incl. 512 Archivvariablen
 
6AV6381-2BV07-0AX0
SIMATIC WinCC/Archive 1500
1500 archive variables
 
6AV6371-1DQ17-0AX0
SIMATIC WinCC/Archive 5000
5000 archive variables
 
6AV6371-1DQ17-0BX0
SIMATIC WinCC/Archive 10000
10000 archive variables
 
6AV6371-1DQ17-0CX0
SIMATIC WinCC/Archive 30000
30000 archive variables
 
6AV6371-1DQ17-0EX0
SIMATIC WinCC/Archive 80000
80000 archive variables
 
6AV6371-1DQ17-0GX0
SIMATIC WinCC/Archive 120000
120000 archive variables
 
6AV6371-1DQ17-0JX0
SIMATIC WinCC/Server
 
6AV6371-1CA07-0AX0
SIMATIC WinCC//Redundancy
 
6AV6371-1CF07-0AX0
SIMATIC WinCC//User Archives
 
6AV6371-1CB07-0AX0
SIMATIC WinCC/ProAgent
V7.0 SP1
6AV6371-1DG07-0AX0
SIMATIC WinCC/Web-Navigator incl. 3 Client licenses
V7.0
6AV6371-1DH07-0AX0
SIMATIC WinCC/Web-Navigator incl. 10 Client licenses
V7.0
6AV6371-1DH07-0BX0
SIMATIC WinCC/Web-Navigator incl. 25 Client licenses
V7.0
6AV6371-1DH07-0CX0
SIMATIC WinCC/Web-Navigator incl. 50 Client licenses
V7.0
6AV6371-1DH07-0DX0
SIMATIC WinCC/Web-Navigator Diagnose Client
V7.0
6AV6371-1DH07-0EX0
SIMATIC WinCC/Web-Navigator Diagnostic Server
V7.0
6AV6371-1DH07-0FX0
SIMATIC WinCC/Connectivity Pack
V7.0
6AV6371-1DR07-0AX0
SIMATIC WinCC/Connectivity Station
V7.0
6AV6371-1DR17-0AX0
SIMATIC WinCC/DataMonitor incl. 1 Client license
V7.0
6AV6371-1DN07-0LX0
SIMATIC WinCC/DataMonitor incl. 3 Client licenses
V7.0
6AV6371-1DN07-0AX0
SIMATIC WinCC/DataMonitor incl. 10 Client licenses
V7.0
6AV6371-1DN07-0BX0
SIMATIC WinCC/DataMonitor incl. 25 Client licenses
V7.0
6AV6371-1DN07-0CX0
SIMATIC WinCC/DataMonitor incl. 50 Client licenses
V7.0
6AV6371-1DN07-0DX0
SIMATIC WinCC flexible Compact
2008 SP1
6AV6611-0AA51-3CA5
SIMATIC WinCC flexible Standard
2008 SP1
6AV6612-0AA51-3CA5
SIMATIC WinCC flexible Advanced
2008 SP1
6AV6613-0AA51-3CA5
SIMATIC WinCC flexible /ChangeControl for WinCC flexible Compact/Standard/Advanced
2008
6AV6613-6AA01-3AB5
SIMATIC WinCC flexible /Sm@rtAccess for SIMATIC Panel
2008
6AV6618-7AB01-3AB0
SIMATIC WinCC flexible /Sm@rtAccess for WinCC flexible Runtime
2008
6AV6618-7AD01-3AB0
SIMATIC WinCC flexible /Sm@rtService for SIMATIC Panel
2008
6AV6618-7BB01-3AB0
SIMATIC WinCC flexible /Sm@rtService for WinCC flexible Runtime
2008
6AV6618-7BD01-3AB0
SIMATIC WinCC flexible /OPC-Server for SIMATIC Multi Panel
2008
6AV6618-7CC01-3AB0
SIMATIC WinCC flexible /OPC-Server for WinCC flexible Runtime
2008
6AV6618-7CD01-3AB0
SIMATIC WinCC flexible /Archives for WinCC flexible Runtime
2008
6AV6618-7ED01-3AB0
SIMATIC WinCC flexible /Recipes for WinCC flexible Runtime
2008
6AV6618-7FD01-3AB0
SIMATIC WinCC flexible /Archives+Recipes for WinCC flexible Runtime
2008
6AV6618-7GD01-3AB0
SIMATIC WinCC flexible Runtime, 128 Power Tags
2008 SP1
6AV6613-1BA51-3CA0
SIMATIC WinCC flexible Runtime, 512 Power Tags
2008 SP1
6AV6613-1DA51-3CA0
SIMATIC WinCC flexible Runtime, 2048 Power Tags
2008 SP1
6AV6613-1FA51-3CA0
SIMATIC WinCC flexible Runtime, 4096 Power Tags
2008 SP1
6AV6613-1GA51-3CA0
SIMATIC WinCC flexible /ProAgent for SIMATIC Panel
2008
6AV6618-7DB01-3AB0
SIMATIC WinCC flexible /ProAgent for WinCC flexible Runtime
2008
6AV6618-7DD01-3AB0
SIMATIC WinCC flexible /Audit for SIMATIC Panel
2008
6AV6618-7HB01-3AB0
SIMATIC WinCC flexible /Audit for WinCC flexible Runtime
2008
6AV6618-7HD01-3AB0
     
SINUMERIK HMI Software
   
SIMATIC STEP7 for SINUMERIK Hardware
V5.4 SP4
6FC5252-5AY01-4AG0
SINUMERIK Toolbox 810D/840D Add-on for STEP7
V5.4 SP4
no separate order no.
TRANSLINE 2000 HMI Pro RT
V7.2.0.5
6FC5263-0PY50-0AG0
TRANSLINE 2000 HMI Pro CS
V7.2.0.5
6FC5263-0PY80-0AG0
HMI Advanced
V7.3 SP3
6FC5253-7BX10-3AG0
SINUMERIK HMI for WinCC flexible
2008
6FC5253-1CX25-3AG0
     
     
A&D Data management
   
A&D DataManagement Agent
V1.2
6BQ3030-1AA00-1AB0
A&D DataManagement Client
V6.1
6BQ3030-1AA20-1AC0
     
Sensors & Communication    
SIMATIC RFID Systems (RF170C)
V1.3.3
6GT2080-2AA10
SIMATIC RF-MANAGER - 1 Reader
2008
6GT2080-3CA00-8AA5
SIMATIC RF-MANAGER - 5 Readers
2008
6GT2080-3CC00-8AA5
SIMATIC RF-MANAGER - 20 Readers
2008
6GT2080-3CE00-8AA5
SINEMA E Lean 2006 SP3 6GK1781-0AA00-6AA0  
SINEMA E Standard 2006 SP3 6GK1782-0AA00-6AA0
     
SIRIUS Tools
   
Sirius Motor Starter ES Premium (Floating License)
2007 SP1
3ZS1 310-6CC10-0YA5
Sirius Motor Starter ES Standard (Floating License)
2007 SP1
3ZS1 310-5CC10-0YA5
Sirius Motor Starter ES Basic (Floating License)
2007 SP1
3ZS1 310-4CC10-0YA5
Sirius Soft Starter ES Premium (Floating License) 
2007 SP1
3ZS1 313-6CC10-0YA5
Sirius Soft Starter ES Standard (Floating License) 
2007 SP1
3ZS1 313-5CC10-0YA5
Sirius Soft Starter ES Basic (Floating License)
2007 SP1
3ZS1 313-4CC10-0YA5
Sirius SIMOCODE ES Premium (Floating License) 
2007 SP1
3ZS1 312-6CC10-0YA5
Sirius SIMOCODE ES Standard (Floating License)
2007 SP1
3ZS1 312-5CC10-0YA5
Sirius SIMOCODE ES Basic (Floating License) 
2007 SP1
3ZS1 312-4CC10-0YA5
Sirius Modular Safety System ES 2008 3ZS1314-5CC10-0YA5
Please note:
  • The products STEP 7, S7-SCL, S7-GRAPH and S7-PLCSIM are also available as a bundle in "STEP 7 Professional".
  • Existing product licenses can be upgraded with the upgrade licenses provided for this purpose.
Installation requirements
Hardware requirements 
Premium Studio includes software packages for different target systems. A difference is made between PGs/PCs (Programming devices / PCs) and the PCU50 target system (target system of the SINUMERIK HMI runtime software). To be able work with the software on these DVDs, you require one of the following two hardware platforms and a DVD drive:
  • A programming device or a PC with Pentium III microprocessor or better and at least 256 MB RAM. We recommend a Pentium IV microprocessor with min. 512 MB RAM. The required space on the hard disk is approx. 15 GB for a complete installation of all the included software packages.
     
  • PCU50 with 566 MHz microprocessor and min. 256 MB RAM. We recommend a microprocessor with 1.2 GHz and 256 MB RAM. The required space on the hard disk depends on the scope of the installation and is up to 3 GB for the installed software. 
The Premium Studio Setup automatically identifies the target system and offers only the relevant products for installation.
Operating system / software requirements
  • Microsoft Windows XP Professional Service Pack 2
  • Microsoft Windows Vista Business / Ultimate (not all included products support this operating system)
  • WinCC requires the WinCC embedded SQL server for operation (supplied together with Premium Studio).
Readme files
The Readme file on the DVD provides more information on the products.
You can read it as pdf::
Ordering information
Designation Order No.
Premium Studio 2009, on DVD with Trial Licenses for many of the included software products. 6ES7815-8CD08-0YA7
Premium Studio Software Update Service (SUS). The scope of delivery only includes the data carrier (DVD) with Trial License. 6ES7815-8CD00-0YL7
For more information please go to the Siemens Internet Pages or the A&D Mall, or you can speak to your SIMATIC partner at your local Siemens office (SIMATIC partners in the Internet)

Reblog this post [with Zemanta]

Siemens WinCC Flexible 2008 SP1 Download

Siemens AGImage via Wikipedia
Long day... I'm not write in my blog because I'm working for 2 months in China and Blogger is blocked by Law.
 Today, I got news... Please read below, I hope useful for us.. Thanks.

Service Pack 1 download for WinCC flexible 2008.
Installation Prerequisite:
  • WinCC flexible 2008 Micro
  • WinCC flexible 2008 Compact
  • WinCC flexible 2008 Standard
  • WinCC flexible 2008 Advanced
  • WinCC flexible 2008 ASIA Standard
  • WinCC flexible 2008 ASIA Advanced
  • WinCC flexible 2008 CHINA Standard
  • WinCC flexible 2008 Runtime
Please also take note of all the Service Pack 1 information and function expansions that we have put together in the article with the ID 34780187.  
Customers with a valid Software Update Service contract (SUS contract) for WinCC flexible 2008 will receive the Service Pack 1 automatically.  

For customers without SUS contract, we are making available the following supply sources:
  1. Order from your Siemens Representative You can order a DVD containing the Service Pack 1 for WinCC flexible 2008 from your Siemens representative for a nominal charge. You will require the following item number: S79220-B1580-P
     
  2. Free Download We are also offering a free download. Please be aware of the file size.

    WinCC flexible 2008 SP1.exe ( 1330906 KB )
If you have speed internet more than 300KBps it will be better, only need 1 hour for download.



Reblog this post [with Zemanta]

Tuesday, December 8, 2009

Maintenance Management of your company's PLC (Programmable Logic Controller).

Made by me of a constructed panel with my digi...Image via Wikipedia
  • What is a PLC?
  • How many PLCs is your bottom line depending on?
  • Do you have an up to date list of all PLC model types, part availability, program copies, and details for your company?
  • Do you have at least one trained person per shift, to maintain and troubleshoot your plant PLCs?
  • Does your maintenance personnel work with PLCs following written company or corporate policy, and procedures?
If you could not answer with confidence or you answered ‘No’ to any of the above questions, you need to read this article on maintenance management of PLCs. Why? Because the PLCs (Programmable Logic Controllers) are the brains of your operation. When the PLC is not functioning properly, lines shut down, plants shutdown, even city bridges and water stations could cease to operate. Thousands to millions could be lost by one little PLC in an electrical panel that you never even knew existed. But most importantly, damage to machine and personnel could result from improper maintenance management of your company’s PLCs.
What is a PLC?
First I’d like to explain in the most non-technical terms possible, What a PLC is. As this article is not just for the maintenance technician, but for maintenance managers, plant managers and corporate managers. A PLC (Programmable Logic Controller) is the type of computer that controls most machines today. The PLC is used to control AND to troubleshoot the machine. The PLC is the brain of the machine. Without it, the machine is dead. The maintenance technicians we train, are the brain surgeons. That is how I explain it to my doctor any way. (His mouth drops open, “... you train brain surgeons?”)
Important Note: Just as a doctor asks the patient questions to figure out what is wrong, a maintenance technician asks the PLC questions to troubleshoot the machine. The maintenance technician uses a laptop computer to see what conditions have to be met in order for the PLC to cause an action to occur (like turn a motor on). In a reliable maintenance management environment, the maintenance technician will be using the PLC as a troubleshooting tool to reduce downtime.
A little more detailed definition of a PLC: A programmable controller is a small industrial strength computer used to control real world actions, based on its program and real world sensors. The PLC replaces thousands of relays that were in older electrical panels, and allows the maintenance technician to change the way a machine works without having to do any wiring. The program is typically in ladder logic, which is similar to the wiring schematics maintenance electricians are already accustomed to working with. Inputs to a PLC can be switches, sensors, bar codes, machine operator data, etc. Outputs from the PLC can be motors, air solenoids, indicator lights, etc.
How many PLCs is your bottom line depending on?
My company has had an ongoing PLC related global maintenance survey since the year 2000. The majority of the participants back in 2001, reported 3-6 PLCs in their facility, that they know of. Granted most participants are managers and don't open electrical panels much, but many of the participants are from fortune 500 companies having hundreds of employees. The odds are most of them have 12-30 PLCs in their facilities. Currently the average is 6-9 reported, so the good news is the industry as a whole is becoming more PLC aware.
It is common to only learn about a PLC once the machine is down and the clock is ticking at a thousand dollars an hour, or more. Unfortunately, it is also common that after the fire is out, it's on to the next fire, without fully learning what can be done to avoid these costly downtimes in the future, and in other similar machines in a company or corporation.
Some older electrical panels may only have relays in them, but most machines are controlled by a PLC. A bottleneck machine in your facility may have a PLC. Most plant air compressors have a PLC. How much would it cost if the bottleneck or plant air shut down a line, a section of your facility, or even the entire plant?
Do you have an up to date list of all PLC model types, part availability, program copies and details for your company?
The first step to take is to perform a PLC audit. Open every electrical panel, and write down the PLC brand, model, and other pertinent information. Then go the next two steps. Analyze the audit information and risk, then act on that analysis. To help you out, I want to share with you our company PLC audit form.
Collected Information Recommended Action
Machine or Area Name Ex: warehouse conveyor, pump station 3, Strapper 2, Line 7, Traffic signal west main, etc.
PLC Program Name Ex: 1789GAA1, P3, Strap2, 5872443, WestMainTL, etc.
Network Node Address No two addresses will be the same. Ex: 2, 3, 17, 21
Network Name Common to be same as Program name, but not mandatory.
PLC Brand Ex: Allen Bradley, Siemens, Schneider, Mitsubishi, DirectSoft, Omron
PLC Model Number Ex: PLC-5/25, SLC-504, SIMATIC S5, MELSEC FX1N, DL 405
Is Spare Available Yes on shelf, or only in less critical machines or no
Date Program Last Backed Up Make program backups part of your semiannual PM program
Discriptored Copy of program available Without discriptored copy of program, troubleshooting and downtime are greatly increased.
Does PLC have EEPROM Or other method of storing backup program in a chip on PLC
Last date Program Changed Remember to log when outside consultants or OEM make program changes too.
Last date EEPROM Burned Should be saved to EEPROM (Burned) after every successful program change.
Date battery last changed See manufacturer’s data for recommended change frequency.
Other information you may need Might be facility location when corporate HQ is using this form.
Once you have collected the basic information in your Plant wide and/or corporate audit, you need to analyze the information to develop an action plan based on risk analysis. In the risk analysis, bottlenecks and other factors will help you assess priorities. Starting with the highest priority PLC, you will need to ask more important questions.
  • Do we have the most common spares for the PLC?
  • Is the OEM (Original Equipment Manufacturer) available 24/7? Or even in business any more?
  • Do we have a back up copy of the PLC program?
  • Does our program copy have descriptions so we can work with it reliably and efficiently?
  • Do we have the software needed to view the PLC program? Are our maintenance personnel trained on that PLC brand?
These are some of the questions our managers must ask, to avoid unnecessary risk and to insure reliability.
Do you have at least one trained person per shift to maintain and troubleshoot your plant PLCs?
Is your maintenance staff trained on the PLC? (Silly to squander over a couple thousand in maintenance training when the lack of PLC knowledge could cost you 10 thousand an hour. ... or worse. I can give you a couple good reasons why you should have at least one trained person per shift, to work reliably with PLCs. You do not want to see greater downtime on off shifts because the knowledge base is on day shift only. Also with all the baby boomers (our core knowledge base in the industry) about to retire, it is not smart management to place all your eggs in one basket.
Then the question should be asked, what should we look for in training. Well I have been training individuals for over a decade and could easily write another article on just PLC training alone. I can tell you here, that you should seek training with two primary objectives.
1. The training you decide on, should stress working with PLCs in a Safe and Reliable way. (not just textbook knowledge or self learned knowledge)
2. Secondly, the training should be actually centered around the PLC products you are using or plan to use in your facility.
I feel the two criteria above are the most important. Some other good ideas to get more out of your PLC training investment would be to get hands on training using the actual PLC programs and software the maintenance technician will be working with in the facility. Insure your personnel have the software, equipment and encouragement to continue with self education. PLC Training CBT (Computer Based Training) CDs are a great way for employees to follow up 6 months after the initial training. Some other ideas you could do is to provide them with simulation software and/or a spare PLC off the shelf to practice with.
Does your maintenance personnel work with PLCs following written company or corporate policy and procedures?
It seems that in our industrial culture, if policy and procedures are not written and enforced, we eventually stray back to the old unreliable ways. I have reviewed many policy and procedures as well as books on the topic matter and hardly ever see maintenance management of the PLCs included. It amazes me how an organization can write guidelines for what they believe is the health of the entire organization’s body, and leave out the brain (the PLC :>). Once again, a complete PLC policy and procedure manual is out of the scope of this article. However, I will donate a few random items below to get you started.
  1. Write PLC policies and procedures into your existing maintenance policy and procedures. (SOP)
  2. All personnel working with PLCs will be trained on that PLC equipment.
  3. Backup copies of the PLC programs will be made every 6 months regardless of change status.
  4. If a PLC program has been changed ...
    • It will be documented in the software copy, in the printed copy and in the CMMS program.
    • Copies of the PLC program will be stored on a media more reliable than floppy disk (CD, USB, etc.).
    • Multiple copies will be stored on laptop, maintenance manager’s office and off site (corporate).
    • If available, EEPROM will be updated with new changed program.
    • If outside vendor changes, a-d will be performed by maintenance personnel
  5. Future equipment purchases ...
    • A common PLC brand in all equipment will be sought out (Standardization of PLC types)
    • OEM will be required to provide a descriptor copy of PLC programs in the customer’s native language.
    • All PLC 110v control voltage will have a line filter on it.
    • All PLCs will have the backup EEPROM option for zero downtime in some failure modes.
  6. Forcing inputs and outputs on or off shall be treated as a Safety issue. (See safety SOP)
  7. Inputs and outputs shall not be forced on or off with out a clear understanding of complete effect on PLC program and a second opinion.
    • If forces are installed, they shall be removed with in 24 hours and a more permanent solution found.
    • All forces should be documented in software and a written log before being enabled.
  8. Online programming is somewhat of a safety risk, normal procedure is to change offline and download to the PLC.
Hope this helps, if you have a specific question you can find me in the PLC discussion area at the PLC Discussion Forum.
Don Fitchett (President)
Business Industrial Network
PLC Training - The best for less
www.bin95.com
Reblog this post [with Zemanta]

Wednesday, December 2, 2009

PLC Training / Tutorial for Allen-Bradley (Video 1 of 11)

ClassroomImage via Wikipedia

These proven training techniques distinguish Ron Beaufort's Training from most other courses.
Find the rest of the series here:
http://www.youtube.com/watch?v=jhLIOM...
Learn to be an effective troubleshooter, by teaching you to think the same way PLCs do.

These subjects are typically covered in the first few hours of the 40 hour long PLC Boot Camp course. The class room teaching is done with challenging hands-on exercises that ensure you retain what you learn.

These videos focus on the PLC-5, SLC-500, and Micrologix series. There are also PLC Boot Camp classes for the ControlLogix platform.

See this channel for the rest of this series:
http://www.youtube.com/RonBeaufort

Visit : http://www.ronbeaufort.com for more lessons online


Reblog this post [with Zemanta]
#